L3 Gigabit Switch, 8-port 10/100/1000T PoE++, 2-port 100/1000X SFP, 3-port DC-Input, One designated PWR300 requires at least (as supports up to 3). 5 year NCP support (Start date is shipment date from ATI - Grace period 90 days)
L3 Gigabit Switch, 8-port 10/100/1000T PoE++, 2-port 100/1000X SFP, 3-port DC-Input, One designated PWR300 requires at least (as supports up to 3). 5 year NCP support (Start date is shipment date from ATI - Grace period 90 days).
Features:
• Operating Temperature: -10°C to 55°C.
• Rackmount.
• 5 year NCP support (Start date is shipment date from ATI - Grace period 90 days).
Features:
• Operating Temperature: -10°C to 55°C.
• Rackmount.
• 5 year NCP support (Start date is shipment date from ATI - Grace period 90 days).